We've had some really amazing weather the last week. We got almost a foot of snow! Dan had to put up a tent to keep the snow off of his work area.
The weather was warm enough for a while that we were able to get another section of the deck done. The front deck is all finished.
I took Halicia out in the snow - she has never shoveled snow before let alone this much!
It is back to -20 outside so we're working on the inside of the house. We're working on tiling the kitchen so our fridge is in the livingroom! :) makes for some interesting cooking.
All the trim and crown in the house is done! Dad did a great job.
Almost looks like a kitchen out of a magazine doesn't it? (The blue dishwasher won't be blue forever)
The tile now goes all the way back to the bathroom. Trouble is we now have bridges all over the place! Makes it interesting to walk around. We have no stove so supper was on the bbq - which means Dan had to carry plates, balance on a board, and try to open the door! Oh yeah, and we ran out of propane half way through so Dan changed the tank while the food got cold and had to start cooking all over again!